Installed right.Built to last.

Certified solar engineers ensuring optimal performance, warranty protection, and complete safety for your home or business across all 36 states in Nigeria.

Pet-Feb Certified Solar Installation Engineers
ENGINEERING STANDARD

Why Certified Engineering Matters

In Nigeria's high-temperature, surge-prone environment, amateur solar wiring causes inverter blowouts, battery degradation, and fire hazards. Pet-Feb installations protect your capital.

Schedule Load Audit

Full Warranty Validation

Protects Tier-1 solar panel linear generation and hybrid inverter factory warranties through certified torque and voltage calibrations.

Tier-1 Factory Escrow

Trained & Certified Techs

Every installer is a certified Pet-Feb Academy graduate and licensed technician trained in high-voltage DC safety protocols.

NEMSA Verified Wiremen

Grid & Gen Interlocking

Sub-millisecond ATS interlocking prevents catastrophic generator backfeeding into solar inverters or DISCO grid feedback spikes.

Zero-Crossfeed ATS

Lifetime Support

Cloud telemetry health checks, automated battery degradation tracking, bi-annual thermal scans, and rapid 24-hr regional dispatch.

24/7 Telemetry Alerting
ENGINEERING DISCIPLINE

5-Step Engineering Deployment Process

Every Pet-Feb deployment follows strict international IEC standards from initial roof survey to cloud telemetry commissioning.

01

Audit & Survey

24-hr electrical load profiling, roof pitch & structural truss checks, irradiance azimuth mapping, and earthing earth-resistance test (<5 Ohms).

Day 1 · Field Survey
02

CAD Design

PVsyst solar simulation, MPPT string sizing, generator ATS wiring schematics, and stamped electrical engineering drawings.

Day 2–3 · Engineering
03

Hardware Staging

Secure transport from Lagos/PH hubs in dedicated vehicles. Batteries pre-balanced and inverter firmware calibrated prior to delivery.

Day 4 · Logistics Dispatch
04

Mounting & Wiring

Anodized aluminum roof rails, fire-retardant DC cabling in rigid trunking, Schneider DC isolation switches, and pure copper grounding mat.

Day 5–6 · Site Execution
05

Testing & Handover

Phase-rotation confirmation, thermal imaging scan, IoT app synchronization, client emergency training, and NEMSA certificate pack.

Day 7 · Commissioning
TRANSPARENT BILL OF MATERIALS

Standard Package Scope

No surprise electrical surcharges or hidden add-ons. Full transparency before our engineering truck rolls to your site.

Included in Turnkey Package

Standard
Anodized Aluminum Mounting RailsHigh-grade, coastal corrosion-resistant rails and stainless steel 304 hardware.
Type-2 Lightning Surge Protection (SPD)Dual protection arrays for DC solar string inputs and AC main utility feeds.
Fire-Rated Solar DC CablingHalogen-free, double-insulated 6mm² or 10mm² copper cabling routed in rigid metal conduits.
Schneider DC Isolation BreakersPre-assembled IP65 distribution enclosure with rapid DC disconnect switches.
Pure Copper Earthing Rod & BondingDriven deep earth rod with bentonite treatment ensuring resistance under 5 Ohms.
Client Handover & App OrientationComplete schematic binder, emergency runbook, and real-time smartphone monitoring setup.

Not Included / Custom Scope

Quoted Separately
Major Structural Roof RepairsRectifying decayed structural timber rafters or replacing brittle asbestos tiles requires specialized civil carpentry.
Civil Trenching Beyond 25 MetersDeep underground cable trenching between inverter powerhouse, generator, and main DB beyond 25m is billed per linear meter.
Premises Rewiring of Faulty Internal CircuitsResolving legacy phase imbalances, neutral loops, or short-circuits in building wiring requires dedicated electrician prep.
DISCO Bilateral Net-Metering PermitsGrid-tied export metering documentation and bilateral utility clearance require municipal DISCO administrative processing.
Need Civil or Structural Carpentry Support?Our engineers inspect your roof rafters during the initial site survey and quote any custom civil works upfront before deployment.
ON-SITE ENGINEERING ASSESSMENT

Book Your Certified Site Survey

Complete the dispatch request below. A COREN/NEMSA-verified field engineer from our nearest regional hub will contact you to schedule your load audit.

24-Hour Dispatch SLANEMSA Certified Level-3 Desk

Request an Installation or Site Survey

Connect with Petfeb's certified regional engineering team for an on-site solar assessment within 24 business hours.

Your information is secure and will only be used to schedule your installation assessment.

Certified Protection

NEMSA Code & Workmanship Guarantee

All Pet-Feb installations comply with Nigerian electrical safety standards and include full workmanship protection alongside manufacturer hardware warranties.

  • Zero-Crossfeed Automatic Transfer Switch (ATS)
  • Infrared Thermal Load Scan at Handover
  • Stamped Electrical Engineering As-Built Pack
  • Buy Small Installment Bundling Available
Direct Engineering Dispatch

Need Urgent Commercial Sizing?

Speak directly with our senior electrical engineers in Lagos, Abuja, or Port Harcourt.

Installation FAQs

Clear guidelines on turnkey installation costs, timeframes, and state coverage across Nigeria.

How much does professional solar installation cost?

Standard residential turnkey installation depends on system kVA capacity, roof pitch, DC cable run distance, and earthing soil conditions. All quotes are confirmed upfront after your technical site assessment with zero hidden charges.

How long does an installation typically take?

Most residential rooftop installations (1kVA to 5kVA) are completed and commissioned within 24 to 48 hours once components arrive on site. Commercial arrays (10kVA to 30kVA+) typically require 3 to 5 business days for structural racking and distribution switchgear synchronization.

Do Pet-Feb engineers install in all 36 states?

Yes. With direct regional engineering hubs in Lagos, Abuja, and Port Harcourt, our mobile installation units deploy across all 36 states and the FCT with dedicated logistics vans and certified tools.

What happens if my roof has leaks or timber decay?

During our initial audit, engineers inspect timber truss deflection and roofing sheet integrity. If structural defects are identified, we document the required carpentry repairs upfront so your roof is reinforced before solar panels are secured.

Can I pay for installation using the Buy Small installment plan?

Yes. When purchasing equipment through Buy Small, your certified installation fee can be bundled directly into your downpayment and amortized across your weekly or monthly installments.